|
Desc: The framing and sheeting is all done. It took three days to complete the entire framing structure. Two days with a two man crew and one day with a guy by himself. They did have some help from a bunch of us who would carry all that lumber and sheeting from the street in front to the building site in back. We have a half acre lot, so it is a long way around the pool, the garage and the front yard to get to the street. Can not wait to move all the sheetrock.
|