Stargate Resources Projects Contact US Polls Forums Quiz
 


 


Intro

 


Foundation

Home Theater Build structure Foundation
  Build structure
 
Desc: It has been four year since the main slab was poured. You can see the additional footing that was poured on the north side of the building Left side of the photo. This added five feet to the width of the building. And put the building a little closed to the pool. We now have a 20 foot by 30 foot building. We had a four year wait, which is a lot of time to think about the building and make changes. The framers are starting to build the four foot high knee wall that will support the floor joist.